The first day on the air from the Sovereign Military Order of Malta has passed. We worked hard yesterday and today early in the morning and now have 5 stations running. The Spiderbeam, the 2 hexbeams, the verticals, and the dipoles were erected without any problems. Only the high temperature and humidity were not very comfortable.
The team is tired, but happy for the job done. Tomorrow we will try to fix the issue of the logging system. The 6m QSO’s are not shown in the online log, because the 6m station is too far away from the HF shack to have it connected through wi-fi. We will manually upload the 6m log 3-4 times daily if we can’t fix to wireless connection.
A special thanks to Michele IZ4GWE and Sergio IK0FTA for the support for the station and to all of the donors for the donation we are receiving.